Project Description
JMPC was appointed to prepare preliminary concept drawings and outline budget costs for the development of the large commercial site shown in the photographs along side.
This initial assessment also included considering the following with regards to the site;
- The optimum site layouts.
- The statutory planning implications.
- The infrastructure requirements – electricity, water, drainage, etc
Budget costs for the site infrastructure works were I the region of £1.5M and should this project progress, JMPC hope to be appointed as designer, quantity surveyor and project manager for the entire scheme.