JMPC is appointed by a large commercial business to design and project manage the construction of a new 1250m2 industrial building to include external foundations for associated client equipment and an internal pit for client machinery. The project has a very tight lead in time with specialist equipment due to be delivered in late 2022. The entire must therefore be operational by the end of 2022/early 2023.

JMPC appoints the following sub-consultants.

  • Structural Engineer – SDD Ltd, Lisburn
  • M&E Engineers – Bailie Associates, Lisburn
  • Health & Safety – Hasco Europe, Newtownards

Work commences immediately on the following.

  • Production of detailed outline budget costs
  • Production of a detailed programme for the works
  • Production of design drawings for sign off & for tendering
  • Submission of Planning Permission and a Building Control Application

See photograph below of the site prior to works commencing.